OPERATION
107
Automatic Tests
This section describes how to create, edit and run automatic tests.
Automatic tests allow you to link up to 10 different MANU tests
and run them sequentially within a single AUTO test. Each stored
MANU test is used as a test step when creating an AUTO test. In
addition, up to 5 groups of AUTO test can be interconnected
together to present an ever-advanced AUTO tests.
 Choose/Recall an AUTO Test→ from page 108
 Creating an AUTO Test File Name → from page 109
 Adding a Step to the AUTO Test → from page 110
 Continuous AUTO Tests → from page 112
 AUTO Test Page Editing → from page 114
 Running an Automatic Test → from page 120
 Automatic Test Results → from page 126
Before operating the GPT-10000 please read the safety precautions
as outlined in the Set Up chapter on page 22.