14215700-IG, Edition 8.0
April 2018, Original document
44
Installation Requirements
Safety and Handling information is available online at http://support.spectralink.com/products.
All Spectralink documents are available at http://support.spectralink.com/products.
Requirements for Spectralink IP-DECT Server 200/400
The Spectralink IP-DECT Server 200/400 is a combined Spectralink IP-DECT Base Station and
server.
For more information about requirements, see "Requirements for Spectralink IP-DECT Base Sta-
tion and Spectralink DECT Repeater" on the next page.
Requirements for Spectralink IP-DECT Server 6500
and Spectralink DECTMedia Resource
Environmental Requirements
The installation area must:
l be clean, free of traffic and excess dust, dry, and well ventilated
l be within the temperature ranges of 10°C and 40°C/50°F and 104°F
l be between 20% and 80% non-condensing relative humidity
Note:
The installation area must be of sufficient height from the floor to prevent water damage.
1U rack space in a 19" cabinet or respective space on the wall when mounting the Spec-
tralink IP-DECT Server 6500 in vertical position on a wall.
For more information about installing the Spectralink IP-DECT Server and Spectralink DECTMedia
Resource, see "Installing the Spectralink IP-DECT Server 6500 and Spectralink DECTMedia
Resource" on page55.
Spectralink IP-DECT Server 200/400/6500 Installation and Configuration Guide