The instructions contained in this Maintenance Manual are intended to help to ensure
that the maintenance which must be carried out at specific intervals is correctly
carried out.
It is a precondition that the personnel charged with such important work possesses
the necessary training and experience.
Information about the operation of the engine as well as descriptions of the function of
the various systems are part of a separate book, the Operation Manual containing
also under 00101 explanations of the layout and structure of the Operation and
Maintenance Manuals as well as of the used symbols, signs and special characters.
More detailed instructions on the operation and maintenance of components from
sub-suppliers can be gathered from the instruction leaflets of the respective
manufacturers. Outside makes are, for example, such engine components, tools or
devices which are not manufactured in accordance with production drawings from
WinGD Ltd.
The ”Maintenance Manual” is divided into the following main chapters:
1) General guidelines for maintenance
2) Clearance tables, tightening values of screwed connections, masses (weights)
3) Maintenance schedule
4) Design groups
5) Tool lists
A few explanations to the above:
1) The General Guidelines for Maintenance contain, in addition to recommendations
on precautionary measures to be taken, also suggestions for carrying out the
work.
2) The above mentioned tables inform about normal and maximum acceptable
clearances, the tightening of important screwed connections, weights of individu-
al engine components as well as the type and use of various sealing rings.
3) The Maintenance Schedule indicates nominal intervals in which various mainte-
nance operations are to be carried out. Please note that the maintenance inter-
vals are based on experience and are subject to operation of the engine under
standard conditions.
4) Detailed instructions are given in the Design Groups on the procedure of mainte-
nance work on certain engine parts.
5) Tools and devices necessary to carry out maintenance are described in the Tool
Lists, and are generally supplied with the engine.
All information contained in the text and illustrations of this manual are valid at the
time of printing.
Modifications will be incorporated in the next edition.
2015

Table of Contents

Other manuals for WinGD X72

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the WinGD X72 and is the answer not in the manual?

WinGD X72 Specifications

General IconGeneral
BrandWinGD
ModelX72
CategoryEngine
LanguageEnglish

Related product manuals