Maintenance0002−1/A1
Table of Contents
Winterthur Gas & Diesel Ltd.
2/ 4
2016-11
Cylinder Liner and Cylinder Cover Group 2
Cylinder Liner
Measure the Bore 2124−1/A1....................................................................
Removal and Installation 2124−2/A1..............................................................
Remove Unwanted Material, Dress the Lubricating Grooves and Scavenge Ports 2124−3/A1............
Lubricating Quill: Removal and Installation 2138−1/A2...............................................
Piston Rod Gland: Replace, Assembling, Wear Measurement 2303−1/A1..............................
Cylinder Cover
Removal and Installation of Cylinder Cover and Water Guide Jacket 2708−1/A1........................
Removal and Installation of Cylinder Cover and Water Guide Jacket (with Recommended Tool) 2708−1/A2
Injection Valve − Sealing Face Machining 2708−3/A1...............................................
Injection Valve: Removal and Installation 2722−1/A1.................................................
Injection Valve:
Disassemble, Checks, Assemble (Injection Valve with FAST) 2722−2/A1.............
Starting Valve: Removal, Disassemble, Grinding, Assemble, Installation 2728−1/A1....................
Exhaust Valve
Exhaust Valve − Removal and Installation 2751−1/A1...............................................
Disassemble and Assemble 2751−2/A1...........................................................
Valve Seat − Removal, Grind ans Installation 2751−3/A1............................................
Valve Head − Grind the Seating Surface 2751−4/A1................................................
Crankshaft, Connecting Rod and Piston Group 3
Crankshaft: Measuring Crank Deflection 3103−1/A1.................................................
Vibration Damper
Silicone Fluid Sample 3130−1/A1................................................................
Inspection − GEISLINGER Vibration Damper 3130−2/A1............................................
Axial Damper: Removal and Installation 3140−1/A1..................................................
Turning Gear: Teeth and Screwed Connections − Check 3206−1/A1...................................
Crankcase: Work Platform 3301−1/A1...............................................................
Connecting Rod
Bottom End Bearing − Inspection, Removal and Installation 3303−2/A1...............................
Top End Bearing − Removal, Inspection and Installation 3303−3/A1..................................
Removal and Installation 3303−4/A1..............................................................
Top End Bearing Cover − Removal, Inspection and Installation 3303−5/A1............................
Crosshead
Clearance Checks 3326−1/A1...................................................................
Crosshead Pin − Removal, Installation, Clearance Checks 3326−2/A1................................