Maintenance
0002−1/A1
Table of Contents
Winterthur Gas & Diesel Ltd.
3/ 4
2019−08
Piston
Removal and Installation 3403−1/A1..............................................................
Disassemble and Assemble 3403−3/A1...........................................................
Top Surface Check 3403−4/A1...................................................................
Piston Rings: Wear of Piston Rings and Ring Grooves 3425−1/A1.....................................
Driving Wheels and Shut-off Valve for Starting Air Group 4
Driving Wheels
Running and Backlash Clearances and Tooth Condition 4103−1/A1..................................
Replacing the Gear Wheel on the Crankshaft 4103−2/A1............................................
Shut-off Valve for Starting Air: Cleaning and Function Check 4325−1/A1...............................
Supply Unit, Injection and Exhaust Valve Control Group 5
Fuel Pump
Disassemble and Assemble 5556−1/A1...........................................................
Removal of a Seized Pump Plunger 5556−2/A1....................................................
Fuel Pressure Control Valve: Removal, Check, Installation 5562−1/A1.................................
Fuel Pressure Control Valve: Manual Release Valve − Clean 5562−1/A2................................
Relief Valve: Removal, Check, Installation 5562−2/A1................................................
Flow Limiting Valve: Removal, Inspection, Installation 5562−3/A1.....................................
Fuel Pump Unit
Camshaft and Bearing Shells − Removal and Installation 5581−1/A1.................................
Lubrication of Supply Unit during Maintenance 5552−5/A1...........................................
Fuel Pump Actuator
Connection to Fuel Pump 5583−1/A1.............................................................
Servo Pump Unit
Servo Oil Pump − Removal and Installation (with Hawe SOP) 5591−1/A1.............................
Exhaust Valve Control Unit: Removal, Disassemble, Assemble, Installation 5612−1/A1.................
Scavenge Air Receiver and Auxiliary Blower Group 6
Scavenge Air Receiver − Checks and Cleaning 6420-1/A1...........................................
Auxiliary Blower − Removal and Installation 6545-1/A1..............................................
Scavenge Air Cooler − Removal and Installation 6606-1/A1...........................................
Water Separator − Removal and Installation 6708-1/A1...............................................
Scavenge Air Waste Gate − Disassemble and Assemble 6735-1/A1...................................
Cylinder Lubrication Group 7
Cylinder Lubrication System 7218−1/A1.............................................................
Integrated Electric Balancer (iELBA)
Bearing Replacement and Adjustment 7758−1/A1.................................................
Replacement of Proximity Sensors 7762−1/A1.....................................................