CELL-DYN 3000 System Operator’s Manual 5-79
9140240E — May 1995
Chapter 5 Operating Instructions
4. Place the racks in the Sample Loader tray with the slotted side
facing the Analyzer.
NOTE: All 10 racks must be in the tray (5 on each side) for the
Sample Loader to operate.
5. Put the Sample Loader safety cover in place.
NOTE: The Sample Loader will not operate without the safety
cover.
6. Press the START key on the Sample Loader.
7. The Sample Loader automatically processes all the samples.
Processing stops when the end rack is finished.
Daily Shutdown
It is not necessary to perform a Daily Shutdown procedure as the
instrument automatically goes into a STANDBY mode if it has been idle
for four hours. If desired, the operator may place the instrument in the
STANDBY state by pressing [SPECIAL PROTOCOLS], followed by
[MORE], followed by [DAILY SHUTDOWN].
When the key is pressed or when the automatic shutdown is initiated, the
cycle:
Rinses the flow system
Sets the timer control that periodically opens all of the solenoid
valves to prevent pinched tubing