9-42 CELL-DYN 3000 System Operator’s Manual
9140240E — May 1995
Maintenance Chapter 9
8. Replace the white caps on the line.
9. Repeat Steps 4 through 8 with the other drain line.
10. Replace the upper and lower front covers on the Analyzer.
11. Power ON the Analyzer and then power ON the Data Station.
12. Verify that the background counts are acceptable by running 5
background counts before running controls. If background counts
or controls are unacceptable, refer to Chapter 10, Troubleshooting.