110 1100 Series FD Reference Manual
4 Troubleshooting and Test Functions
The Wavelength Calibration Procedure
Steps
1 Preparation of the Glycogen Calibration Sample.
2 Preparation of the Flow Cell.
3 Wavelength Calibration.
4 Verification using “Check of Raman Band of Water" on page 104.
Preparation of the Glycogen Calibration Sample
1 To prepare 10 ml of the calibration solution you have to use 10 mg of the
Glycogen sample (a tolerance of
±20% is not critical).
2 Fill the prepared amount into a suitable bottle/vial.
3 Fill 10 ml of distilled water into the vial and shake.
4 Wait 5 minutes and shake again. After 10 minutes the solution is ready.
When required If application requires, or see Ta b l e 1 8 on page 101.
Tools re quired Laboratory balance
Parts required Glycogen Calibration Sample, Syringe, needle, sample filter and PEEK fitting
from the Accessory Kit