Installation Summary Table
STEP OPERATION FURTHER REF. DONE
1.
PROVISIONS FOR INSTALLATION C3G
Plus Technical Specifications
2.
CHECK PACKING LIST
–
3.
ACQUAINTANCE WITH OPERATOR INTERFACE Chapter 3 of manual
4.
CONNECTION TO POWER MAINS C3G
Plus circuit diagrams
5.
C3G
Plus - ROBOT CONNECTIONS C3G-MMUX manual
6.
APPLICATION BOX CONNECTIONS
Application Box
manual
7.
CONNECTION OF SAFETY DEVICES AND CUTTING OFF
COMMANDS LEADING FROM THE TRANSFER
Robot manual/
chapter 4 of manual
8.
ACTIVATION OF C3G
Plus Application manual
9.
RPT BACK-UP BATTERY CONNECTION (WHEN
INSTALLED)
Chapter 7 of manual
10.
C3G
Plus - ROBOT ROBOT OFF LINE FUNCTIONAL
CHECK
Chapters 3 and 5 of manual
11.
TURN_SET OPERATION Chapter 3 of manual
12.
DEACTIVATING THE C3G
Plus Chapter 3 of manual
13.
ROBOT SYSTEM INTEGRATION
Chapter 4 of manual/
cell documentation
14.
FUNCTIONAL CHECK OF THE INSTALLED ROBOT
SYSTEM
Chapter 4 of manual/
cell documentation