FRONT WHEEUBRAKE/SUSPENSION/STEERING
INSTALLATION
Install the fork pipe [1] into the steering stem.
If
th
e fork has been reassembled, temporarily tighten
the bottom bridge pinch bolt
12]
and tighten the fork cap
"'.'!~~
bolt [3) to the specified torque. l
TORQUE:
22
N'm (2.2 kgf'm,
161bHt)
l oosen the bottom bridge pinch bolts and pull
up
the
fork pipe to the
lop
bridge.
Align the
lOp
end
of
the fork pipe with the upper surface
of
the
lop
bridge as shown.
Tighten the bottom bridge pinch bolt [1)10 the specified
torque.
TORQUE
: 32 N'm (3.3
kgf-m
, 24
IbHt)
Tighten the
lop
bridge pinch bolt to the specified torque.
TORQUE:22 N'm (2.2
kgf
'
m,
161bHt)
InslaU the following:
- Fr
onlwheel(page14-13)
- Number plate (page 2-5)
14-25