18. Connect each of the cables to the other port (the one to which the other cable
was originally attached). The following will now be true:
v The cable originally connected to port 0 will now be connected to port 1.
v The cable originally connected to port 1 will now be connected to port 0.
Attention: You must fully connect the cable and tighten the connectors
screws within 30 seconds of when the cable makes contact with the port. If
you do not the link will fail and you must disconnect and reconnect again. If
the connector screws are not tightened errors will occur on the link and it will
fail.
19. Refresh the port status for the first failing resource by:
a. Wait 1 minute.
b. Select the Cancel function.
c. Select the Refresh function.
d. Select the Display detail option for the first failing resource.
20. Complete the information for column B in the HSL Link Status Diagnosis
Chart by doing the following:
Note: If you need help finding the Display HSL Information screen, refer to
BUS PIP HSL-02 on page 298.
a. In the Display HSL Information screens, follow the leading or trailing port
function until you have reached the frame and port pair that you recorded
as the first failing resource in column A. In column B record the port
status for the same two HSL ports on the first failing resource.
b. In the Display HSL Information screens, follow the leading or trailing port
function to the frame and port pair that you recorded as the second failing
resource in column A. In column B record the port status for the same
two HSL ports on the second failing resource.
21. Determine what to record for all the rows of column C by performing the
following:
v For the port status in column C, compare the port status that you recorded
in column A to the port status you that recorded in column B.Ifthe
ports status is Failed in both column A and column B, then mark in the
same row of column C the letter X otherwise, leave this row in column
C blank.
22. Refer to the information that you recorded in the Appendix G. HSL Link
Status Diagnosis Form on page 967.
Locate and move to the frame identified in column A for the second failing
resource. Label the cables in order to restore them later.
23. Disconnect the HSL cables.
24. Are the connections optical links?
No Yes
Clean the HSL cable connector and port using the tools and
procedures listed in symbolic FRU OPT_CLN on page 561. Go to
step 26 of this procedure.
25. Wait at least 30 seconds.
26. Connect each of the cables to the other port (the one to which the other cable
was originally attached). The following will now be true:
v The cable originally connected to port 0 will now be connected to port 1.
v The cable originally connected to port 1 will now be connected to port 0.
Bus, High-Speed Link (HSL) PIPs
Chapter 3. Problem Isolation Procedures (PIPs), Failing Items, and Symbolic FRU Isolation 291

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM i 830 and is the answer not in the manual?

IBM i 830 Specifications

General IconGeneral
BrandIBM
Modeli 830
CategoryServer
LanguageEnglish

Related product manuals