EasyManuals Logo
Home>IBM>Server>i 830

IBM i 830 User Manual

IBM i 830
1000 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #940 background imageLoading...
Page #940 background image
must stop all applications, including console applications, and subsystems
that are running in all logical partitions, before the delayed power-off
operation is complete.
Attention: Using the control panel power push-button to power off the system
may cause unpredictable results in the data files, and the next IPL will take longer
to complete.
Powering Off a Secondary Partition
Attention: Powering off a secondary partition will not power off any expansion
tower(s) that the partition owns. If it is necessary to power off the expansion
tower(s) owned by the secondary partition, use the Expansion Tower and SPCN
Controlled Expansion Unit Power Procedure. Power off the secondary partition(s)
before powering off the expansion tower(s) owned by the logical partition(s).
If the secondary partition is operating under Dedicated Service Tools (DST), power
off the logical partition by selecting the Power Off the System option on the Start a
Service Tool (SST) display of the secondary partitions console.
Note: To locate the secondary partitions console or alternative console, see iSeries
Service Functions.
If the secondary partition is operating under OS/400, from the logical partitions
console enter the PWRDWNSYS command to power off the secondary partition.
Note: For consoles on the secondary partition that run Client Access, a delayed
power-off operation by using the PWRDWNSYS command is required. You
must stop all applications, including console applications, and subsystems
that are running in the secondary partition before the delayed power-off
operation is complete.
If the secondary partition fails to power off or if the console of the secondary
partition is not functioning:
1. Go to the console of the Primary partition.
2. From the Use Dedicated Service Tools (DST) screen, select the Work with System
Partitions option.
3. At the Work with System Partitions screen:
a. Select the Work with Partition Status option.
b. Select the Power off Delayed option and press enter.
If the secondary partition fails to power off then go to Powering Off a System
with Multiple Logical Partitions Using the Control Panel or Primary Partitions
Console on page 925.
Expansion Tower and SPCN Controlled Expansion Unit Power
Procedure
Attention: If there is an SPD migrated tower on the HSL loop with this tower,
then follow this procedure very carefully. This procedure will help you determine
if the SPD migrated tower is the next tower (leading link) or the previous tower
(trailing link) from this tower on the loop. Powering down a tower when the next
tower or the previous tower on the loop is an SPD migrated tower will cause a
machine check that will crash the entire system.
Data Recovery and General System Information
926
iSeries Model 830, 840, SB2, and SB3 Problem Analysis, Repair and Parts V5R1

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM i 830 and is the answer not in the manual?

IBM i 830 Specifications

General IconGeneral
BrandIBM
Modeli 830
CategoryServer
LanguageEnglish

Related product manuals