EasyManuals Logo
Home>IBM>Server>i 830

IBM i 830 User Manual

IBM i 830
1000 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #314 background imageLoading...
Page #314 background image
j. Select the Associated packaging resources option for the HSL I/O Bridge or
Network Interface Controller (NIC) with the resource name that you
recorded for the second failed resource.
k. Record the frame ID, card position, and port. Record this information for
the second failing link in Appendix G. HSL Link Status Diagnosis Form
on page 967.
l. Select the Display detail option and record the card position for the second
failing resource.
16. Have you repeated steps 2 through 15 for a second time during this
procedure?
No Yes
Return to the procedure that sent you here.
This ends the procedure.
17. Does the first failing link and the second failing link have the same frame ID?
No Yes
Return to the procedure which sent you here.
18. The following steps guide you through disconnecting and reconnecting the
HSL cable connection between the first and second failing resources to
determine if the cable connectors are properly seated and cleaned
19. Disconnect the cable at the frame ID, card position, and port that you
recorded for the first failing resource.
20. Is the connection an optical link?
No Yes
Clean the HSL cable connector and port using the tools and
procedures listed in symbolic FRU OPT_CLN on page 561. Go to
step 22 of this procedure.
21. Wait at least 30 seconds.
22. Reconnect the cable to the port.
Attention: You must fully connect the cable and tighten the connectors
screws within 30 seconds of when the cable makes contact with the port. If
you do not, the link will fail and you must disconnect and reconnect it again.
If the connector screws are not tightened errors will occur on the link and it
will fail.
23. Disconnect the cable at the frame ID, card position, and port that you
recorded for the second failing resource.
24. Is the connection an optical link?
No Yes
Clean the HSL cable connector and port using the tools and
procedures listed in symbolic FRU OPT_CLN on page 561. Go to
step 26 of this procedure.
25. Wait at least 30 seconds.
26. Reconnect the cable to the port.
Attention: You must fully connect the cable and tighten the connectors
screws within 30 seconds of when the cable makes contact with the port. If
you do not the link will fail and you must disconnect and reconnect again. If
the connector screws are not tightened errors will occur on the link and it will
fail.
Bus, High-Speed Link (HSL) PIPs
300
iSeries Model 830, 840, SB2, and SB3 Problem Analysis, Repair and Parts V5R1

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM i 830 and is the answer not in the manual?

IBM i 830 Specifications

General IconGeneral
BrandIBM
Modeli 830
CategoryServer
LanguageEnglish

Related product manuals