EasyManua.ls Logo

Philips IntelliVue MP70 - Maintenance Schedules and Test Procedures

Philips IntelliVue MP70
278 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3 Testing and Maintenance Recommended Frequency
34
Recommended Frequency
The testing checklist appears in the next section of this chapter. Perform the procedures as indicated in
the suggested testing timetable. These timetable recommendations do not supersede local
requirements.
Suggested Testing Timetable Frequency
Preventive Maintenance Tests
NBP Calibration
Sidestream CO
2
Calibration
CO
2
pump / CO
2
scrubber replacement
Required
Once a year, or as specified by local laws.
Once a year or after 4,000 hours continuous
use and following any instrument repairs or
the replacement of any instrument parts.
Once every three years or after 15 000
operating hours
Performance and Safety Tests
Temperature Accuracy
ECG/Resp Performance
Invasive Pressure Performance
SpO
2
Performance
Mainstream CO
2
Performance
EEG Performance
C.O. Performance
BIS Performance
SvO2 Performance
tcGas Performance
VueLink Performance
Nurse Call Relay Performance*
ECG Sync Performance*
*Only when in use as part of hospital protocols
Recommended: Once every two years, or if
you suspect the measurement is incorrect
Safety Checks (in accordance with IEC 60601-
1)
System Enclosure Leakage Current
Protective Earth
Patient Leakage Current
Recommended: Once every two years and after
repairs where the power supply is replaced or
the monitor has been damaged by impact.

Table of Contents

Related product manuals