Remote Device Site Requirements 8 Site Preparation
157
Humidity
Operating: 20% to 85% Relative Humidity (RH) (non-condensing)
Storage: 5% to 85% Relative Humidity (RH)
Altitude
Operating: 0m to 3000m (10000 ft.)
Storage: 0m to 12000m (40000 ft.)
Electrical and Safety Requirements (Customer or Philips)
Safety Requirements
If the MP60/MP70 monitor is to be used in internal examinations on the heart or brain ensure that the
monitor is connected to an equipotential grounding system.
Grounding
The MP60/MP70 monitor MUST be grounded during operation (Class I equipment according to
IEC 60601-1). If a three-wire receptacle is not available then the hospital electrician must be consulted
to ensure that proper grounding is available on installation. NEVER attempt to use a three-wire to
two-wire adapter with the MP60/MP70 monitor.
WARNING Each component must be individually grounded for safety and interference suppression purposes.
Electrical Requirements
Line Voltage Connection
The MP60/MP70 monitor uses < 145 W (1.6 to 0.7 A).
Line Voltage
The MP60/MP70 monitor may be operated on ac line voltage ranges of
100 to 240V (50/60 Hz).
Remote Device Site Requirements
The system can be installed with one or more combinations of the following remote devices.
Flexible Module Server or Multi-Measurement Server
Remote Display
Remote Alarm Device
Remote Extension Device (with or without SpeedPoint)
Where more than one site is used for locating equipment (a remote installation), the following sections
should be considered for EACH device:
• Space Requirements
• Environmental Requirements