9 Anesthetic Gas Module Repairing the Anesthetic Gas Module
266
When to Perform Test Blocks
Service Event
(When performing.....
Test Block(s) Required
....... Complete these tests)
Installation Visual, Power On
Performance Leakage Check, Diagnostic Check, Zero Calibration Check,
Barometric Pressure Check,
Span Calibration Check and Normal Operation Check
Repair/Parts replacement Performance Leakage Check, Flowrate Check, Diagnostic Check,
Zero Calibration Check, Barometric Pressure Check,
Span Calibration Check and Normal Operation Check,
Safety (whenever the topcover was opened)
Preventive Maintenance Parts Replacement as described in Chapter 5 of
the Anesthetic Gas Module Service Manual (part number M1026-9000B).
Fan Check, Pump Test, Performance Leakage Check, Flowrate Check,
Diagnostic Check, Zero Calibration Check, Barometric Pressure Check,
Span Calibration Check and Normal Operation Check, Safety