System-specific checklists
108580_en_02 PHOENIX CONTACT 247 / 272
C 1.3 Startup
Checklist for starting up the PROFIsafe system
Equipment identification
Date
Editor Test engineer
Comment
No
.
Requirement Ye s Comment
1 Have the requirements from the applicable standards for the sys-
tem/machine been observed and met in the startup phase?
2 Is safety ensured during the startup phase by means of additional mea-
sures and if so what are these measures (see also No. 1)?
1 ______________________________________________________
2 ______________________________________________________
3 ______________________________________________________
4 ______________________________________________________
5 ______________________________________________________
6 ______________________________________________________
7 ______________________________________________________
8 ______________________________________________________
9 ______________________________________________________
10 _____________________________________________________
Additional requirements in: __________________________________
3 Are adjustments to the F_WD_Time
min
required in order to ensure rug-
gedness of the system and system availability, since the actual
iSPNS 3000 cycle time may deviate from the iSPNS 3000 cycle time
estimated during the planning phase?
4 Are measures implemented against unauthorized network access?
5 Are specifications for the startup phase applicable and have they been
met?
Date Signature (editor)
Date Signature (test engineer)
NOTE: Do not exceed F_WD_Time
max
The set F_WD_Time must not exceed the F_WD_Time
max
from the defined SFRT. (See also “Validation” checklist)