EasyManua.ls Logo

SciCan Statim 2000 - Page 166

SciCan Statim 2000
275 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 164
STAT
IM
2000/2000S Service Guide
96-108639 Rev 3.0
7. Electrical and Electronic Components
6. A dielectric strength test (Hi-Pot) and a protective bonding impedance test (ground continuity)
should be performed on the STAT
IM
unit at this stage.
NOTE: These tests must be performed on the STATIM again once the work is completed and
the cover has been returned to the unit.
7. Plug the power cord (3) into the line filter and the wall receptacle and turn the power switch (2)
ON. Observe the LCD and indicator lights to determine that power is present.
STATIM 2000/2000S/2000 G4 Service Guide

Table of Contents

Other manuals for SciCan Statim 2000

Related product manuals