EasyManua.ls Logo

SciCan Statim 2000 - Filling the STATIM Reservoir; Priming the STATIM Pump

SciCan Statim 2000
275 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 259
STAT
IM
2000/2000S Service Guide
96-108639 Rev 3.0
13. Installation
STATIM 2000/2000S/2000 G4 Service Guide
Installation
Environmental Considerations
There are several factors that may affect the performance of your STATIM.
Please review these factors, and select a suitable location in which to install the unit.
Temperature and Humidity
Avoid installing your STATIM in direct sunlight or close to a heat source
(e.g. vents or radiators). The recommended operating temperatures are
15-25˚C (59˚F to 77˚F) with humidity of 25-70%.
Spacing
The vents and openings on the STATIM should remain uncovered and unobstructed. Leave a
minimum of 50 mm/2˝ between the top, sides and back of the unit and
any wall or partition.
Venting
The STATIM should be operated in a clean, dust free environment.
Work Surface
The STATIM should be placed on a flat, level, water-resistant surface.
Never install and operate the unit on a sloped surface.
Electromagnetic Environment
The STATIM has been tested and meets applicable standards for electromagnetic emissions.
While the unit does not emit any radiation, it may itself be affected by other equipment which
does. We recommend that the unit be kept away from potential sources of interference.
Electrical Requirements
Use properly grounded and fused power sources with the same voltage rating as indicated on the
label at the back of your STATIM. Avoid multiple outlet receptacles. If using a surge suppressor
power bar, plug in one STATIM only.

Table of Contents

Other manuals for SciCan Statim 2000

Related product manuals