Maintenance
1132−2/A1
Winterthur Gas & Diesel Ltd.
11/ 14
17) Attach the second spur-geared chain
block (94017−006, Fig. 25) to the
gallery and the lifting tool (94116A)
18) Operate the spur-geared chain blocks
(94017−006) to move the bearing shell
to the fuel side as shown.
19) Install the deviation pipe (94117A,
Fig. 26) to the column.
20) Attach the chains (94019A/B) to the
gallery as shown.
21) Attach the chains (94019B) to the
spur-geared chain block (94017−006)
to move the bearing shell to the fuel
side as shown.
22) Put the bearing shell on to wooden
underlay on the bottom plate.
2015
Main Bearing − Removal and Installation
94017−006
94116A
94117A
94019A/B
I
94017−006
94019B
94019A
I
Fig. 25
Fig. 26