2-12 CELL-DYN 3000 System Operator’s Manual
9140240E — May 1995
Installation Chapter 2
2.Test Sample Loader operation by running several blood samples. If
necessary, refer to the directions given in the Routine Operation
section of Chapter 5, Operating Instructions.
3.Confirm that the background count is acceptable before running
patient samples. (Refer to the Routine Operation section of
Chapter5, Operating Instructions, for instructions for running
background counts.)