Chapter 4 - Operational Procedures -
AS-410M Auto Slide Preparation System
137
4-12-3 Outline of roughing operation
Preoperational setup
Operating condition
setting
Roughing
in progress
Shutdown procedure
Operation completes
Power OFF
Setup works before and after power-
ON (See Chapter 3.)
Power-ON and initialization
“Roughing Settings”
Specify “Slicing thickness” and “No. of cuts.” Select
ON/OFF for “Humidifying” and “Tape.”
Specify sample position(s).
(See 4-13-4)
Enable attachment to carrier
tape
Pausing
Step-by-step operation
Start roughing.
(See 4-13-5)
Button operations during
roughing (See 4-13-6)
MAIN screen
Select MAINTENANCE.
Select ROUGHING.