031914 M6-9
SEAL AND BEARING REPLACEMENT
STEP 1 MOVE THE MACHINE TO THE
“CLEAN” POSITION
1. Touch the “Run” screen button on the
“Home” screen. (Illustration 1)
2. Touch and “hold” the “Move to Clean”
button on the “Run” screen. (Illustration
2) Continue touching the button until the
machine moves to the “clean" position.
ADANGER!
Follow your company’s lockout/tagout
procedure before disassembling the
machine.
STEP 2 TURN “OFF” MAIN POWER AND
MAIN AIR (Illustration 3)
TRANSFER CONVEYOR REPAIR
MAIN POWER
HANDLE WITH
LOCKOUT
DEVICE
ILLUSTRATION 3
ILLUSTRATION 1
“RUN” BUTTON
ILLUSTRATION 2
“MOVE TO READY” BUTTON