EasyManua.ls Logo

Fujitsu ETERNUS CS800 S5 - Handling Instructions for the Rack; Unpacking and Checking the Delivery Unit; Detaching and Transporting the Delivery Unit

Fujitsu ETERNUS CS800 S5
634 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing the Rack Handling Instructions for the Rack
U41840-J-Z125-7-76 83
Handling Instructions for the Rack
V
CAUTION!
The activities described in this chapter may only be performed by technicians,
service personnel or technical specialists. Ignoring the instructions in this
manual can result in personal injury or damage to equipment.
For safety reasons, four people are required to install the rack model
because of its weight and size.
When the unit is transported, it may be tilted at most by 15°.
The unit must remain in the original package until it has reached its installation
location.
Make sure the floor at the final place of installation has sufficient load-bearing
capacity.
Always ensure that the tilting protection is mounted when you set up the rack
(risk of tipping over).
Unpacking and Checking the Delivery Unit
1. Unpack all the individual parts of the delivery unit.
2. Check the delivery for damage sustained during transport.
3. Check whether the delivery matches the specifications in the delivery note.
V
CAUTION!
Should you discover that damage has occurred during transport or that the delivery
does not match the delivery note, notify your supplier immediately!
The rack is shipped on a pallet to which it is secured.
Required tools:
6 mm hexagon key (provided)
Long Torx screwdriver (TX25)
Detaching and Transporting the Delivery Unit
Detaching from the wooden pallet
The unit is seated on the pallet and is secured with six metal retaining brackets.

Table of Contents

Related product manuals