Unpacking the Modules Installing the ETERNUS CS800 S5 Modules
80 U41840-J-Z125-7-76
Unpacking the Modules
By following these instructions, you help ensure that the system will continue to be
safeguarded after it arrives at the installation site.
V
CAUTION!
Do NOT discard the packing materials after the system is unpacked. The packaging
materials must be used if the system is relocated.
W
WARNING!
The server weighs 55 lbs (25.0 kg) and the storage module weighs 77 lbs (35.0 kg)
respectively. Two people are required to lift either chassis.
Content of the Server Transport Box (on Delivery without Rack)
● RX300 S8 server
● Rackmount kit
● 2 power cords
● Safety Notes and Regulations manual
● Documentation CD including the User’s Guide
● Quick Start poster
● Label-sheet
Content of the Cable Transport Box
with Scale model only:
● 2 FC cables
● 2 LAN cables
with Entry model only:
● 1 SAS cable
Content of the JX40 Storage Transport Box
● JX40 module
● Flange cover
● Rackmount kit
● 2 power cords