GE HEALTHCARE PROPRIETARY TO GE
D
IRECTION 5344303-100, REVISION 3 VIVID P3 SERVICE MANUAL
Chapter 3 Installation 3-11
3-5-1-2 Turn on the system
Press the Power On/Off switch at the front of the system once.
When the Power On/Off switch on the Control Panel is pressed once, the
TMST starts and the software code is distributed to initiate the scanner.
No status messages are displayed during this process.
3-5-2 Power Off/ Shutdown
NOTE: After turning off a system, wait at least ten seconds before turning it on again. The system may not be
able to boot if power is recycled too quickly.
3-5-2-1 TMST Power Down
To power down the system:
1.) Press the Power On/Off switch at the front of the system.
Figure 3-6 Power On/Off Switch
Power On/Off switch