MAINTENANCE, CLEANING AND REPAIR 
Information for general use 
Rev. M / 73023639 
 
10.1.2. First inspection 
To ensure that the work carried out during installation and start-up remains functional in the long term, 
check the following points after one month. Complete the form. 
 
Date of inspection ___. ___. 20____ 
Q2 serial number: ______________ Q2 software:______ 
Gas connections, gas lines and flow meters have been checked with a 
methane detector and are tight. 
Housing parts (washer/flow meter) are undamaged and secure.  
The openings in the breather elements are free of dirt and blockages. 
Gas and electrical connections are undamaged and free of corrosion. 
No corrosion inside the device, all cores are securely connected. 
Pipelines and cables around the Q2 are undamaged and free of corrosion. 
The  ground  connection  is  mechanically  secure.  There  is  a  low  resistance 
connection to the ground, both between the equipotential bonding system on 
the  connection  box  (FE)  and  the  external  grounding  connection  (PA),  see 
Figure 5.4. 
Unused connectors are sealed,  
there are no unconnected wires in the connection box. 
The cylinder pressure of the calibration gas mixture is: ______ 
The inlet pressures are in the valid range:   
Process gas pressure: ______  Calibration gas pressure: _____ 
The flow rates (flow meter display) are in the valid range. 
The battery charge is:_________ and is adequate.