COMMISSIONING AND DECOMMISSIONING 
Information for general use 
Rev. M / 73023639 
 
6. Commissioning and decommissioning 
Do not carry out any of the work described in this chapter if you do not have 
permission and have not received the required training from the manufacturer or its 
agents.N’effectuez pas les travaux décrits dans ce chapitre, si vous ne disposez pas 
de l’autorisation ni des instructions du fabricant ou de ses agents! 
 
The  commissioning  procedure  may  only  be  carried  out  by  qualified  technician  or  field  service 
personnel. Honeywell can provide training and commissioning services. 
Before  commissioning,  make  sure  that  Chapter  2  Safety  and  warning  information  have  been 
observed and followed and that the GasLab Q2 has been installed and connected in accordance 
with this document.  
All new devices are supplied with default parameter set also called parameterization, which enables 
them to perform the measuring task. If you are not familiar with the operation and software of the 
instrument,  please  read  first  the  chapters  7  GasLab  Q2  Displays  (Operate  the  Device)  and 
8 Configuration and analysis software enSuite of this document before you continue. 
 
Refer to the regulations for explosion protection and the safety information, particularly 
for starting up the device in a potentially explosive atmosphere. 
Les exigences relatives à la protection contre les explosions et à la sécurité doivent être 
respectées, en particulier lors de la mise en service dans une atmosphère explosible. 
 
 
6.1.  Commissioning preparations and requirements 
The following points must applie:  
•  The upstream sample handling and conditioning system must be operating 
properly, providing the correct pressure to the device, and at its operating 
temperature. 
•  An operational calibration gas cylinder is correctly connected.  
•  Delivery is less than 1 year ago, (battery charge above 20%). If you are unsure 
check according to hints in section 7.3.4 Info display (Device monitor) or have 
the battery replaced as a precaution. 
•  The device is installed and fully closed.  
•  There is no moisture condensation inside the device. If in doubt, remove the 
covers (see next section) and allow the appliance to dry for at least 12 hours; 
or contact Honeywell. 
•  Power supply and communications are carried out properly and is available.