3 CAN cable
4 Power cable, 120 VAC
5 Coolant-supply hose and coolant-return hose
6 Pilot-arc cable
7 Negative cables
8 Pilot-arc, coolant, and shield-water assembly
8a Pilot-arc cable
8b Coolant-supply hose and coolant-return hose
8c Shield-water hose (VWI or OptiMix)
9 Power, CAN, 5-gas assembly
9d Power cable, 120 VAC
9e CAN cable
9f Five gas hoses (VWI or OptiMix)
10 Torch lead
11 Hoses for supply gases/shield water
12 Power cable, 220 VAC
* Regulators
Put a gas regulator 3 meters (10 feet) or less from the gas connect console, or adjust inlet gas pressures to
be in the specified process gas tolerances.
Installation steps
Use this information to install the different system components.
Put the system components in position
Put the plasma power supply in position
The plasma power supply weighs as much as 635 kg (1,400 lb), based on voltage configuration. It must
be lifted and moved with care to avoid injury or damage.
Before you begin:
■
Requirements to put system components in position on page 61
■
Worksite requirements for system components on page 65
Installation
3
91811530Instruction ManualXPR460