EasyManua.ls Logo

Hypertherm XPR460 - Wait for Start State (5); Preflow;Charge DC State (7)

Hypertherm XPR460
532 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
If the Gas Purge/Pump On state (3) completes correctly, the process continues with Wait for Start state
(5) on page 221.
Refer to Initial inspection steps on page 273 for troubleshooting procedures.
Wait for Start state (5)
During the Wait for Start state (5), the CNC sends the Plasma Start command to the cutting system.
Is a new process or
Plasma Start selected?
For new process selection, continue to
Initial Checks state (2).
No
Yes
Wait for the CNC to send the Plasma Start command
to the cutting system.
Wait for a command:
Select a new process or Plasma Start (there is
no limit to how long the system waits for input).
OR
For a Plasma Start command, continue
to Preflow/Charge DC state (7).
If the Wait for Start state (5) completes correctly, the process continues with:
Initial Checks state (2) on page 218 for a new process selection
Preflow/Charge DC state (7) on page 221 for a Plasma Start command
Refer to Initial inspection steps on page 273 for troubleshooting procedures.
Preflow/Charge DC state (7)
During the Preflow/Charge DC state (7), the system starts some internal components and measures the
gas pressure.
Operation
6
221811530Instruction ManualXPR460

Table of Contents

Related product manuals