7. Remove the cover to access the card that you are removing from the system.
See Models 830/SB2 with FC 9074 Covers on page 663.
8. Look at the power LED () for the card that you are removing to ensure that it
is powered off. The power LED () is located above or in front of the card
slot. If the LED is blinking multiple times per second (rapidly) or it is off, then
the card is powered off.
9. You are removing a card in the Models 830/SB2 (FC 9074) Base I/O tower
using Concurrent Maintenance. From the rear of the tower perform the
following:
a. Open the rear cover (see Models 830/SB2 with FC 9074 Covers on
page 663).
b. Remove the EMC access plate that is located directly above the card
enclosure. Press the two latching mechanisms together and tilt the top of
the cover away from the frame to remove it. See Models 830 and SB2
with FC 9074 - Final Assembly, Rear on page 820.
c. Disconnect and label any cables from the card that you wish to remove.
d. Turn the blue latch counter clockwise and lift upward on the black latch to
release the card.
Note: If you are removing a FC 2890, then you must use dedicated
maintenance.
e. Remove the card by gently pulling it out.
f. Install the card in to the system by reversing the card removal procedure
for the model system or tower that you are working on.
g. Select the Power on domain option for the IOA or IOP that you are
installing.
Note: To the right of the description field you will see one or both of the
following symbols displayed:
*
>
The * indicates the location to which the system will assign the
resource. Where as the > indicates the location to which the resource
was last assigned.
h. Press enter, the Work with Controlling Resources screen will appear.
i. Determine the location where you want to assign the resource and select
the assign to option for that location.
j. After exchanging the failing item, then go to Verifying the Repair on
page 920.
Note: If you have exchanged a 2766 Fibre Channel IOA, the IBM 2105 disk
unit subsystem must be updated to use the World-Wide Port-Name
of the new 2766 IOA. This name can be found in the Port worldwide
name field on the iSeries 400 by displaying detail on the 2766 IOA
Logical Hardware Resource information in Hardware Service
Manager in SST/DST. The 16-digit World-Wide Port-Name can also
be determined by including the digits 1000 to the beginning of the
12-digit IEEE Address found on the tailstock label of the Fibre
Channel IOA. Use the ESS Web Interface Users Guide (SC267346) to
update the World-Wide Port-Name in the host configuration on the
IBM 2105 ESS. The ESS Web Interface Users Guide can also be found
Remove and Replace Procedures
Chapter 4. Removal and Installation Procedures 657

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM i 830 and is the answer not in the manual?

IBM i 830 Specifications

General IconGeneral
BrandIBM
Modeli 830
CategoryServer
LanguageEnglish

Related product manuals