Site Preparation Checklist for the SRX5400 Services
Gateway
The checklist in Table 30 on page 147 summarizes the tasks you need to perform when preparing a site for
services gateway installation.
Table 30: Site Preparation Checklist
Date
Performed
ByFor More Information ...Item or Task
“SRX5400 Services Gateway Environmental
Specifications” on page 148
Verify that environmental factors such as
temperature and humidity do not exceed
services gateway tolerances.
“SRX5400 Services Gateway Cabinet Size and
Clearance Requirements” on page 153,
“SRX5400 Services Gateway Rack Size and
Strength Requirements” on page 152
Select the type of rack or cabinet.
“Clearance Requirements for SRX5400 Services
Gateway Airflow and Hardware Maintenance” on
page 151
Plan rack or cabinet location, including
required space clearances.
“Calculating Power Requirements for the SRX5400
Services Gateway” on page 154
Plan electrical power provisions.
“Connection to Building Structure for the SRX5400
Services Gateway Rack” on page 153
If a rack is used, secure rack to floor and
building structure.
Acquire cables and connectors.
DC Power Electrical Safety Guidelines and WarningsLocate sites for connection of system
grounding.
Measure distance between external
power sources and services gateway
installation site.
147