Table 30: Site Preparation Checklist (continued)
Date
Performed
ByFor More Information ...Item or Task
“Calculating Power Budget for Fiber-Optic Cable
for the SRX5400 Services Gateway” on
page 162,“Calculating Power Margin for Fiber-Optic
Cable for the SRX5400 Services Gateway” on
page 163
Calculate the optical power budget and
optical power margin.
SRX5400 Site Guidelines and Requirements
IN THIS SECTION
SRX5400 Services Gateway Environmental Specifications | 148
General Site Guidelines | 149
Site Electrical Wiring Guidelines | 150
Clearance Requirements for SRX5400 Services Gateway Airflow and Hardware Maintenance | 151
SRX5400 Services Gateway Environmental Specifications
Table 31 on page 148 specifies the environmental specifications required for normal services gateway
operation. In addition, the site should be as dust-free as possible.
Table 31: Services Gateway Environmental Specifications
ValueDescription
No performance degradation to 10,000 ft (3048 m)Altitude
Normal operation ensured in relative humidity range of 5% to 90%,
noncondensing
Relative humidity
148