List of key words
Maschinenfabrik Reinhausen GmbH 2019408 5163667/06 ENETOS
®
IM
P
Parallel operation 137, 142
CAN bus 143
Circulating reactive current 139
Information 305
Parallel operation error mes-
sage 147
Power factor 140
Tap synchronization 138
Parallel operation method 143
Parity 221, 261, 265, 272
Password 297
Performing standardization 215
Phase angle correction 118
power factor 140
Power flow
Negative 155
Power flow monitoring 155
Power monitoring 154
Protective device status 190
Q
QS3 30
Query rate 221
Quick search 45
R
Rated power of the transformer
247
Ratio of the evaluated power loss
248
Recorder 169
Average value interval 173
Rectifying faults 333
Reference time263, 266, 269, 277
Regulation 97
Regulation mode 134
Remote behavior 96
Repeat unsolicited messages in-
definitely 276
RES bit test 262
Reversal of power flow 155
RFC 3164 290
RFC 5424 290
Rogers 208
Rotary switch 77
S
SCADA 256
Second time server 293
Select desired value 98, 99
Send delay time 221
Sensor bus
Link functions 223
Serial interface 259, 264, 271, 274
setting of the desired value
analog 99
Step-by-step 100
Single character confirmation 262
SNTP 292, 293
SNTP time server 293
SNTP time server 2 294
Software
Information 305
SSL/TLS encryption 94
State of the bushings 218
Stop bits 221, 262, 265, 272
Subnet mask 257, 267, 273
General 94
SW 3-3 35
Configuration 309
Switching direction 137
Switching point 193
Switching pulse pause 135
Switching pulse time 135
Switch-on delay 194
Synchronization interval 294
Syslog 290
T
Tap difference
Follower 146
Tap position
Changing designation 178
Tap position monitoring 157
Tap synchronization 138
Tap-change operation statistics
179
TAPCON® 2xx retrofit 147
TAPCON® Dynamic Setpoint Con-
trol 101, 104
Target tap position 168
Target-tap-position operation 168
TCP connections 271
TCP Keepalive 271
TCP port 268, 270, 274
Temperature
Curve 174
Monitoring 162
Time 90, 295
Time response T1 113
Time server address 293
Time shift 294
Time synchronization 292
Activate 293
Reference time 263, 266, 269,
277
Time zone 294
TLS version 95
TPLE 316
Transformer
Overview 39
Transformer data 116, 211
Primary current 117
Primary voltage 116
Secondary current 117
Secondary voltage 116
Transmission procedure 260
Tx statistics 163