EasyManua.ls Logo

Nipro SURDIAL - Page 98

Default Icon
198 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13-2
No. Item to be checked
Paint out □
2 Fluid supply and drainage
・ All tubes and lines such as supply and drain tubes
should be free from damages such as folding and
bending.
・ Water supply pressure should be 0.049 ~ 0.74MPa (0.5 ~
7.5kgf/cm
2
)
・ Supply water flow rate should be ≧750mL/min.
・ Supply water temperature should be 17~30℃.
(If heat exchanger is used, it should be 5~30℃.)
・ Water quality should be suitable for dialysis use.
・ Concentrate line pressure should be -100mmHg (136cm
below inlet) to +100mmHg (136cm above inlet).
・ Drain tube end should not be contacted with waste water
level.
□OK □NG
□OK □NG
□OK □NG
□OK □NG
□OK □NG
□OK □NG
□OK □NG
3
Power supply
・ Rating of power supply should conform to that of the
machine.
・ Capacity of power supply should exceed that of the
machine.
□OK □NG
□OK NG
4
Ground connection and equipotentialization
・ Power supply should be provided with protective ground
terminal.
・ Protective ground conductors of power cord and power
plug should be connected correctly.
□OK □NG
□OK □NG
5 Connection of power supply
・ Power cord plug of the machine should be connected to
receptacle of power supply correctly.
□OK □NG
6 Cleaning
・ The machine enclosure should be cleaned.
□ OK □NG

Table of Contents

Other manuals for Nipro SURDIAL

Related product manuals