C 2 Device-specific checklists
This section contains checklists that relate to the phases of life of the RFC 4072S.
C 2.1 Planning
Checklist for planning the use of the RFC 4072S
Device type / equipment identification
Version:
HW/FW
HW/FW (iSPNS 3000)
Date
Editor Test engineer
Comment
No
.
Requirement Ye s Comment
1
Has the systematic “Planning” checklist been observed?
2
Are all measures that are based on applicable standards and the PROFINET
Installation Guideline for Cabling and Assembly planned?
3
Has the current RFC 4072S user manual been used as the basis for planning?
4
Has the power supply for the device and direct I/Os been planned according to
the specifications for protective extra-low voltage in accordance with PELV
according to EN 60204-1 (including safe isolation with PELV voltage according to
EN 50178/VDE 0160)?
5
Are measures planned to prevent simple tampering? If so, what are they?
1 _____________________________________________________________
2 _____________________________________________________________
3 _____________________________________________________________
4 _____________________________________________________________
5 _____________________________________________________________
6
Does the planned use correspond to the intended use?
7
Have the ambient conditions according to the technical data been observed?
8
Has the degree of protection been observed?
9
Have the accessories to be used been planned according to the ordering data in
this user manual (cables, connectors, fiber optic adapters)?
10
Have specifications for assembly and electrical installation been defined (e.g.,
EPLAN) and communicated to the relevant personnel?
11
Have specifications for parameterization been defined and communicated to the
relevant personnel?
12
Have specifications for startup been defined and communicated to the relevant
personnel?
13
Has the technical data of the interfaces been observed?
Date Signature (editor)
Date Signature (test engineer)