EasyManua.ls Logo

Quantum Scalar i6000 - Page 639

Quantum Scalar i6000
738 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 15: Maintaining Your Library
Maintenance Actions
Quantum Scalar i6000 User’s Guide 621
Note: If a yellow caution icon appears next to a scheduled job on
the Reporting Options dialog box, it means there is a
problem with the job. For example, the date for the job
might be in the past. To correct the problem, edit the job to
change job options. For more information about editing
scheduled jobs, see Editing Scheduled Jobs on page 621.
7 Click Close to close the Reporting Options dialog box.
Editing Scheduled Jobs
If you need to make changes to a scheduled job, edit it to change job
options. You can change any job options, such as the date, time, report
template, or e-mail recipients.
1 On the menu bar, click Tools > Reports > Reporting Options. The
Reporting Options dialog box appears.
2 Under Scheduled Jobs, click the job you want to change, and then
click Edit. The Edit Job dialog box appears.
3 Change job options as needed on the Calendar, Reports, and
Recipients tabs.
4 Click OK.
5 Click Close to close the Reporting Options dialog box.
Note: If the start date for a scheduled job is in the past, and it is
not a recurring job, the report will not be generated. To
correct this problem, edit the scheduled job and choose a
start date that is in the future.
Deleting Scheduled Jobs
If you no longer need a scheduled job, delete it.
1 On the menu bar, click Tools > Reports > Reporting Options. The
Reporting Options dialog box appears.
2 Under Scheduled Jobs, click the job you want to delete, and then
click Delete. A dialog box appears asking if you are sure you want to
delete the selected job.
3 Click Yes. The job is deleted from the list of scheduled jobs.

Table of Contents

Other manuals for Quantum Scalar i6000

Related product manuals