C10 HD Installation Manual Section 1: Introduction | Page 1-3
!& !
This section contains definitions and warnings, and practical information to ensure a safe working environment. Please take
time to read this section before undertaking any installation work.
!
‘Maintenance’
All maintenance must be carried out by fully trained personnel. Note: It is advisable to observe suitable ESD
precautions when maintaining electronic assemblies.
‘Non-User Adjustments’
Adjustments or alterations to the equipment may affect the performance such that safety and/or international
compliance standards may no longer be met. Any such adjustments must therefore only be carried out by fully trained
personnel.
‘Users’
This equipment is designed for use solely by engineers and competent operators skilled in the use of professional audio
equipment.
‘Environment’
This product is a class A product intended to form an integrated component part of a professional audio recording,
mixing, TV, radio broadcast or similar studio wherein it will perform to specification providing that it is installed
according to professional practice.
!& ! !
Any mains powered item of SSL equipment that is supplied with a 3-core mains lead (whether connectorised or not) must
always have the earth wire connected to the mains supply ground. This is the safety earth and grounds the exposed metal
parts of the racks and enclosures and must not be removed for any reason.
Safety Information
! !& $
When installing or servicing any item of SSL equipment with power applied, when cover panels are removed,
HAZARDOUS CONDITIONS CAN EXIST.
These hazards include: • High voltages
• High energy stored in capacitors
• High currents available from DC power busses
• Hot component surfaces
Any metal jewellery (watches, bracelets, neck-chains and rings) that could inadvertently come into contact with
uninsulated parts should always be removed before reaching inside powered equipment.