©Tormach® 2024
Specifications subject to change without notice.
Page 7 UM10811: 1500MX Operator's Manual (Version 0424A)
For the most recent version, see tormach.com/support
TABLE OF CONTENTS
4.7.4 Power off the Machine 67
4.8 Install Accessory Components 68
4.8.1 Install the Automatic Tool Changer 68
Required Tools 68
Unpack the ATC Box 68
Prepare the Machine 68
Assemble the ATC 70
Install the ATC Electrical Cabinet 72
Level the ATC 75
Adjust the Tool Alignment and Set the Tool Tray Height and Encoder Position 77
4.8.2 Install the Flood Coolant Kit 78
Required Tools 78
Unpack the Coolant Tank Crate 78
Install the Flood Coolant Pump 79
Install the Flood Coolant Filter 79
Install the Coolant Manifold 80
Install the Y-Axis Washdown Nozzle 80
Install the Flood Coolant Ring 82
Install the Manual Sprayer 83
Make Coolant Connections 86
4.8.3 Install the Automatic Chip Tray Washdown Kit 86
Before You Begin 86
Required Tools 87
Install the Washdown Pump 87
Install the Washdown Coolant Filter 87
Install the Coolant Hoses and Fittings 87
Install the Washdown Bars 88
Make Connections 88
4.8.4 Install the MQL Kit 89
Required Tools 89
Remove the Tubing from the Pump 89
Route the Tubing 90
Mount the Pump 91
4.8.5 Install the microARC 6 93
Install the A-Axis Driver 93
Install the microARC 6 in the Machine 97
4.8.6 Install the Probe and Tool Setter 98
Before You Begin 98
Required Tools 98
Notes 98
Wireless Receiver Installation 98
Wireless Probe Installation and Setup 99
Adjust Probe Tip Concentricity 100
Set Probe Length and Diameter 100
Probe Status Lights Reference 102