Operator and all fluids (e.g., all the lubricants and
fuel in the fuel tank are fully topped up.)
Dozer blade/stabiliser is up (if equipped).
The values in the lifting capacities are in compliance
with ISO10567. Rated loads do not exceed 87% of
hydraulic lifting capacity or 75% of tipping load. See
page
401
for more information.
Overload warning system, checking
NOTE!
A check of the overload warning equipment must be
carried out every 1000 hours, see page
317
.
Operating techniques
Lifting objects
265