6.
PRE-INSTALLATION
The instructions indicated in this chapters and in the following ones enable to
perform a correct installation in order to allow a regular operation of X-MIND prime
3D.
The supplier can provide the assistance and the necessary technical advice for pre-
installation, all masonry works and the pre-installation phase are at the customer’s
charge and must be performed complying with the indications given below.
The requirements for a correct installation of X-MIND prime 3D are:
•
minimum height of the room: 2.5 m (8.20’) and a surface variable according to
the configuration of X-MIND prime 3D to be installed
• No heating devices in close proximity of the unit
•
the entries in the room, for the transport of the unit (after unpackaging), must
have a minimum width of 65 cm (25.6").