©2025 Copeland LP.
026-1803 R13 Supervisor I&O User Guide I - 2
Digital Sensor Control 9-13
Discus Compressor 9-9, 9-10
Display 7-11, 7-12
-E-
E3 2-1
Hardware 2-1
Part Numbers 2-1
Reset 2-1
Specifications 2-1
Updating ETH1 IP Address 12-8
ECB VAV 9-42
Electric Defrost. See Defrost, electric.
Energy Meter
9-41
Enhanced Suction Group 9-10
ETH1 IP Address
Updating
12-8
-F-
Flexible Combiner 9-41
-G-
gging 5-1
Global Data 9-17
-H-
Hand-held Terminal 7-7
Hand-held Terminal (HHT) 7-7
Help Menu 4-11
Hot Gas Defrost. See Defrost, hot gas.
HVAC Control
9-17
HVAC Zone 9-43
-I
I/O Boards 7-1
I/O Network 7-1
problems with 12-2
Icons 4-12
Inputs
Analog
3-10
Digital 3-9
IP Address Location 12-5
IPX 9-63
Irrigation Control 9-55
-L-
Languages 4-7
Lighting Control 9-14
Logging 9-41
Logging Group 5-1
Logging Group, Data Types 5-1
Logging Groups, Supported Function 5-1
Loop Sequence Control 9-57
-M-
Matrix 9-1
Memory
clearing all data from
2-1
Menus 4-1, 5-3
Modular Chiller Control 9-58
Mounting 3-3
MultiFlex 16 Board
features
7-1
MultiFlex Boards 7-1
16 7-1
combination input/output 7-2
RCB 7-7
RTU 7-6
MultiFlex ESR Board 7-7
MultiFlex RCB 7-7
MultiFlex RTU 7-6
MultiFlex RTU Satellite Inputs 7-3
-N-
Navigation 4-1
-O-
Off-Cycle Defrost. See Defrost, off-cycle.
OnBoard I/O
9-30
Online Help Menu 4-11
-P-
Peer to Peer Network 15-23
Peer to Peer Network Setup 6-7
Performance Meter 4-8
PID Control 16-1
PMAC II
defined
7-9
Pulse Modulating Anti-Sweat Controller. See PMAC II.
Pulsed Defrost. See Defrost, pulsed.
Push Button Override
9-14
-R-
RCB 7-7
Recovery Mode, for Case Controllers 9-52
Relay Outputs 3-9
Reset 4-1
Reset Button 2-1
Reverse Cycle Hot Gas. See Defrost, reverse cycle hot gas.
RLDS
9-42
RS485 Network 7-1
RTU 7-6
-S-
SD Card 3-6
Serial Connections 3-8
Site Manager Compatibility 9-64, 9-65, 9-66
Site Supervisor
Hardware
3-1
Part Numbers 3-1
Specifications 3-2
Site Supervisor Display 7-11, 8-1
Connections, 10.1 Inch 8-1
Connections, 15.6 Inch 8-4
Connections, 21.5 Inch 8-6
Specifications, 10.1 Inch 8-2