Installing the Components in the Rack Installing the ETERNUS CS800 S5 Modules
88 U41840-J-Z125-7-76
1. Fully extend the telescopic rails until they lock in place(1).
The telescopic rails must click into place so that they can no longer be moved.
2. At a slight angle, lower the server onto the rear mounting point on the telescopic rails
(2).
3. Fold down the server (3) while pressing the rails inwards to the server sides. Ensure
that all rack mounting bolts (6 or 8) are properly seated in the mounting points on the
telescopic rails and that the locking bars engage (4).
Completing installation
Figure 45: Sliding the server into the rack
1. Release the locking mechanism of both rails (1).
2. Push the server as far as it will go into the rack (2) until the Quick Release Levers (QRL)
engage (3).
I
Note that the QRLs are engaged properly on both sides.
V
CAUTION!
Be careful with your finger. You can pinch it if the QRL changes to the release
position.