5 Power-On Commissioning
Prerequisites
The hardware and cable installation check is complete for controller
components according to data center
specications and requirements.
The device and ECC800-Pro have been powered on.
You have obtained the ECC800-Pro IP address as well as the user name and
password used for WebUI login.
A PC with an IP address in the same network segment as the ECC800-Pro IP
address is prepared, and the PC has connected to the WAN1 port on the
ECC800-Pro.
Context
After installing or replacing the device or ECC800-Pro, set monitoring parameters
and add the device.
5.1 Preparations and WebUI Login
Prerequisites
Supported operating system: Windows 7 and later versions
It is recommended that the screen resolution be 1366 x 768 or higher.
Browser: Chrome, Firefox, Internet Explorer 11 or later
Procedure
Step 1 Connect a network cable between the PC network port and the WAN1 port
(protected by a security mechanism) on the ECC800-Pro.
Table 5-1 Default IP addresses for the WAN and LAN ports on the ECC800-Pro
Port
Default IP Address
WAN1 192.168.8.10
ECC800 Data Center Controller
User Manual (for ECC800-Pro) 5 Power-On Commissioning