NO TICE
1. It is recommended that you perform a battery shallow discharge test only in a
class 1 power grid scenario after conrming with the customer. If the power
grid is not stable, do not perform the battery shallow discharge test.
2. After the UPS is powered o, the battery maintenance period of the UPS will
be recalculated.
3. During a battery shallow discharge test, if the mains outage occurs, the backup
capacity may be inconsistent with the rated capacity.
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose System Settings > Linkage Control. Set Enable linkage control function
to Yes and click Submit.
Step 3 Set Battery shallow discharge test to On.
Step 4 On the Linkage Logical List tab page, click Add or the edit icon
.
Figure 6-69 Setting parameters for Linkage Logic List
----End