32 Issue 3.3.2 / April, 2011
Install G1-RGU- Ring Generator Unit
Power down the system before installation
Fasten the G1E-RGU in position using the 4 supplied screws
Connect the G1-RGU CN1 to the G1E-PWU CN2 using the supplied cable
Note: The G1-RGU must be installed before installing any G1E-SLU cards.
Current G1E+ Stock has RGU as standard.
Make certain that the cable is pushed home firmly into the connector
Install G1E+-RPC Remote Programming Card To G1E+ MBU2
The RPC card will only be able to be fitted to second generation G1E+ MBU’s