EasyManua.ls Logo

Juniper EX4550 - Figure 32: Clearance Requirements for Airflow and Hardware Maintenance for

Juniper EX4550
330 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 32: Clearance Requirements for Airflow and Hardware Maintenance
for an EX4550 Switch Chassis
RearFront
17.36"
44.1 cm
18.49"
(47 cm)
g021407
Clearance required
for maintenance
24" (60.9 cm)
19"
(48.2 cm)
Clearance required
for maintenance
24" (60.9 cm)
Mounting bracket
For airflowFor airflow
6" (15.2 cm) 6" (15.2 cm)
6" (15.2 cm)
For grounding lug
Related
Documentation
• Chassis Physical Specifications for EX4550 Switches on page 17
• Rack-Mounting and Cabinet-Mounting Warnings on page 266
• General Site Guidelines on page 76
• Cooling System and Airflow in an EX4550 Switch on page 35
83Copyright © 2015, Juniper Networks, Inc.
Chapter 6: Preparation Overview

Table of Contents