EasyManuals Logo

Keithley 2651A Reference Manual

Keithley 2651A
800 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #209 background imageLoading...
Page #209 background image
Section 4: Theory of operation Model 2651A High Power System SourceMeter® Instrument Reference Manual
4-12 2651A-901-01 Rev. A / March 2011
Figure 75: Model 2651A V-source load considerations
V-source
(V
S
)
V
s
ou
rc
e
V
I-meter
(I
M
)
V-source
(V
S
)
I-meter
(I
M
)
Operating
point
2 k
Ω
DUT
Load Line (R)
Current
compliance
limit line
Operating
point
I
M
=
V
S
/ R
= 10 V / 2 kΩ
= 5 mA
V
S
= I
M
• R
= (10mA)(800 Ω)
= 8 V
8
0
0 Ω
DUT Loa
d Line (R)
Programmed voltage
source value line
Programmed voltage
source value line
Power
compliance
limit line
a
R
)
n
e
T
L
Current
compliance
limit line
A: Normal V-source operation
Programmed source value:
10 V
Actual source value:
10 V
B: V-source operation in current compliance
Programmed source value:
10 V
Actual source value:
8 V
Current
compliance
limit line
Power
compliance
limit line
C: V-source operation in power compliance
Programmed source value:
10 V
Actual source value:
4.8 V
Programmed voltage
source value line
I-meter
(I
M
)
5 mA
10 mA
10 V
5 V
5 mA
10 mA
10 V
5 V
5 mA
10 mA
10 V
5 V
I-source
(I
S
)
Power limited
current compliance
limit line
Operating
point
V
S
= I
M
• R
= (6 mA)(800 Ω)
= 4.8 V
8
0
0 Ω
DUT Loa
d Line (R)
X

Table of Contents

Other manuals for Keithley 2651A

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Keithley 2651A and is the answer not in the manual?

Keithley 2651A Specifications

General IconGeneral
BrandKeithley
Model2651A
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals