Start-up - Initial commissioning
4 - 5
830 / 07.2012 Original operating instructions
4.4 Initial commissioning
The initial commissioning of the machine is carried out by
SENNEBOGEN or by a trained and authorized specialist.
If the machine is shut down for a prolonged period (> 6 months), it is
essential to contact SENNEBOGEN Customer Service before
recommissioning.
WARNING
Please read C
HAPTER 1 SAFETY.
Before start-up, carry out checks in accordance with Section 4.5.
4.5 Inspections before daily start-up
Observe the safety instructions before starting work.
DANGER
Familiarize yourself with the machine and equipment. Read these
operating instructions before start-up, in particular Chapter 1 Safety.
Only carry out work for which you have been trained and which is
within your working range.
Note
The following pages contain the checklist that should be processed
before starting work with the machine every day. It is divided into:
– A general section (e.g. A1),
– A function section (e.g. F1); and
– A visual check section (e.g. S1).
DANGER
Report all irregularities to the person in charge before start-up. Only
operate the machine after ensuring that it is in full working order.
No.
General Steps to take
A1 Are the danger areas on site (overhead power
lines, ditches etc.) marked and secured?
Mark and secure as necessary
A2 Do you know the operating and
environmental conditions (soil strength etc.)?
If necessary, obtain information
A3 Is an experienced banksman available, if
required?
If necessary, arrange for a banksman
A4 Are there people in the danger area? If so, advise them to leave the danger area
A5 Is the load weight known? Obtain information
A6 Are the machine and sling devices
appropriate for the loads to be suspended?
Refer to the operating instructions and
identification plate as necessary