EasyManua.ls Logo

Acteon X-MIND prime 3D ceph - Page 74

Acteon X-MIND prime 3D ceph
376 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Service Manual Installation
SERVICE MANUAL • X-MIND prime 3D • (19) • 11/2019 • NXMPEN080A
72
5.
Push the package until the upper and lower wall bracket of the system are in
contact with the wall, then mark the position of the screw holes on the wall,
alternatively, use the appropriate template to mark the holes. Note: the
standard fixing includes the upper and lower wall brackets, alternatively you
can fix using the upper bracket and the holes in the floor base.
Mark the holes on the wall
Mark the holes on the wall

Table of Contents

Related product manuals